Waterway Guide Logo
  • SUBSCRIBE
  • Explore
    • Explorer
    • Destinations
    • Marinas
      • Map
      • Directory
    • Services
      • Map
      • Directory
    • Anchorages & Free Docks
      • Map
      • Directory
    • Bridges & Locks
      • Map
      • Directory
    • Navigation Alerts
      • Map
      • Directory
    • Fuel
      • Diesel
      • Gas
      • Fuel Price List
  • Download The App
  • Destinations
  • Knowledge Center
  • Ship Store
    • Ship Store Home
    • Great Lakes Volume 1
    • Great Lakes Volume 2
    • Northern
    • Chesapeake Bay
    • Mid-Atlantic
    • Southern & Gulf Coast
    • Bahamas
    • Cuba
  • Urgent Alerts Urgent Alerts
  • Forgot Password?
    Or log in with:
    facebook
    apple
    Not a member? Join
Modal title

Modal body text goes here.

Log In
Forgot Password?
Or log in with:
facebook
apple

Not a member? Join
Thanks for your valuable feedback!
Back to the Waterway Explorer

View in Waterway Explorer

NC: AIWW MIle 240.7, Onslow Swing Bridge, Scheduled Closures

  • Date Reported: Oct 2, 2024
  • Reporter: Ted Stehle
  • Source: CG 5th District LNM 0540/24
  • Description:

    Mariners are advised that a construction firm, on behalf of U. S. Marine Corps. Base Camp Lejeune, will continue to construct a new bridge to replace the Onslow Beach Swing Bridge across the Atlantic Intracoastal Waterway, mile 240.7, at Camp Lejeune, NC. Construction activities which began in October 2022, are expected to finish in February 2025.

    During the construction period, outside of the extended closure periods listed below, to facilitate construction and installation of the new bridge superstructure, the new bridge will be maintained in the closed-to-navigation position from 8 a.m. to noon and from 1 p.m. to 5 p.m., and the existing Onslow Beach Swing Bridge, will open on demand, from noon to 1 p.m.; Monday through Friday; excluding Federal holidays, from October 7, 2024, through December 20, 2024.

    Vessels unable to safely transit the new bridge with the reduced clearances during the non-extended closure periods above from 8 a.m. to noon and from 1 p.m. to 5 p.m., should: (1) adjust their voyage plan, if able, to transit through the new bridge and the existing bridge outside of the closure period or from noon to 1 p.m. during the closure period, or (2) if not able to adjust their voyage plan, may transit through the bridges upon arrival, if at least a 24-hour prior notice is given to the onsite project foreman.

    To facilitate construction of the bascule span (structural steel), the new bridge will remain in the closed-to-navigation position and will not be able to open at any time during the extended bridge closure periods, as reflected below:

    Primary Closure Timeframe: from 7 a.m. on Monday, November 4, 2024, through 9 p.m. on Thursday, November 7, 2024 from 7 a.m. on Monday, November 18, 2024, through 9 p.m. on Thursday, November 21, 2024

    Alternative Closure Timeframe: from 7 a.m. on Tuesday, November 12, 2024, through 9 p.m. on Friday, November 15, 2024 from 7 a.m. on Monday, December 2, 2024, through 9 p.m. on Thursday, December 5, 2024

    During all closure periods above, the new bridge will have a vertical clearance of approximately 15 feet above mean high water in the closed position and a horizontal clearance of approximately 20 feet. Vessels that can safely transit through the new bridge with the reduced clearances may do so at any time.

    At all other times, the existing Onslow Beach Swing Bridge will operate in accordance with Title 33 Code of Federal Regulations (CFR) 117.821(a)(1), and the new bridge will remain open to navigation. To facilitate construction of the new bridge fender system, a work barge will be placed in the navigation channel of the new bridge from 8 a.m. to noon, and 1 p.m. to 5 p.m.; Monday through Friday, excluding Federal holidays from October 7, 2024, through 5 p.m. on December 20, 2024. The work barge will be located in the navigation channel of the new bridge which will reduce the horizontal clearance of the new bridge to approximately 20 feet.

    Two barges, a support vessel, and crew boat will be operating or stationed in the vicinity of the existing and new bridges. Temporary work platforms will be in place for the duration of construction of the new bridge and demolition of the existing bridge. The work barges, work vessels and bridge tender may be reached on VHF-FM channels 13 and 16, and the onsite project foreman may be contacted at 910-520-1319, when work is in progress or vessels are operating the area. Mariners should navigate the waterway with extreme caution and due regard for prevailing conditions on the waterway.

  • Lat / Lon: N 34° 34.395' / W 077° 16.276'


Be the first to provide comments about this navigation alert

These are observations from the boating community. Waterway Guide information is verified regularly and all efforts will be made to validate any new updates submitted here. Thank you for taking the time to share comments about your experience.

Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.

Current Review Policies

Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.

  • Comments are reviewed and/or verified by Waterway Guide staff and do not post immediately. Please use a valid email address so that we can contact you if we need clarification (email address will not be published).
  • Name will be published. Anonymous comments may not be posted.
  • Comments will be shared with the reviewed marina to offer them an opportunity to respond. If they choose to do so, the marina’s comments may also be posted in response to the original comment.
  • Comments containing foul or obscene language will be rejected or returned for resubmission.
  • Comments containing personal attacks will be rejected or returned for resubmission.
  • Off-topic content will be rejected.
  • Comments must describe commenter's personal experience – “hearsay” reports will be rejected.
  • Comments must be understandable and clear enough to inform other boaters.
  • URL links are allowed only if they inform the content – no “advertising” your business or blog.

Comment on this Navigation Alert

The name field is required.

The email field is required.

  Display?

LOA is required.

Draft is required.


Yes, sign me up for the News & Navigation Alerts.

Sending...

Review Policies
  • Explorer
  • Download The App
  • Destinations
  • Knowledge Center
  • Shop
Popular Resources
Fuel Price Reports
View the Directory
Subscribe To Our Newsletter
logo
About Us
Contact
Advertise
Careers
Legal
Marina Login
© 2024 Waterway Guide Media LLC: All rights reserved. No part of this site may be reproduced without written permission.
Waterway Guide is proud to be a sponsor of:
aglca
mtoa
seven-seas
us-sailing
abm
Apple Sign-In
Note: If you already have a Waterway Guide account please choose, when prompted, to share your email with us so we can sign you in to your proper account.
Newsletter Sign-Up

The "bathroom" on a cruising boat is referred to as the .

The captcha question was answered incorrectly.

The email is invalid. Please close the modal window and try again.

Signing-up...